PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed electrical split wire for the 3rd floor motorized dampers Facing East.jpg Installed motorized dampers at the 2nd floor Facing West.jpg Sprinkler head at the 2nd floor Facing North.jpg 1st block course at the 2nd floor detention cell Facing East.jpg 3rd floor interior metal framing Facing East.jpg 3rd floor interior metal framing Facing South.jpg 4th floor interior metal framing Facing South-West.jpg Electrical split wire at for the 3rd floor motorized dampers Facing South.jpg Installed low roof curbs Facing East.jpg
Previous pageNext page 3rd floor interior metal framing Facing East
3rd floor interior metal framing Facing East